Municipality Of Lila, Bohol

Municipality Of Lila, Bohol

Town Of Adventure

Primary menu

Skip to primary content
Skip to secondary content
  • Home
  • ITB: PURCHASE OF MATERIALS FOR THE MAINTENANCE OF MUNICIPAL SYSTEM
  • Bids and Awards
    • Abstract of Bid
    • Invitation to Bid
      • Barangay
        • 1 set of Fiber Glass Board with Heavy Duty Ring including Installation
        • Rehabilitation of Multi-Purpose Building
        • Rehabilitation of Water Reservoir
      • LGU
    • Notice to Bidders
      • LGU
      • Barangay
    • Purchase Order
  • Governance
    • LGU Structure
      • Mayor’s Office
      • Sangguniang Bayan
      • Treasurer’s Office
      • Accounting Office
      • Engineering Office
      • Local Registrar
      • DSWD
      • MPDC Office
      • Rural Health Unit
      • MAO
      • Assessor
      • Budget Office
    • Municipal Ordinance
    • Barangays
      • Poblacion
      • Nagsulay
      • Malinao East
      • Malinao West
      • Bonkokan Ubos
      • Bonkokan Ilaya
      • Banban
      • Cogon
      • Macalingan
        • ITB: Construction of Basketball court Fence
        • ITB: Rehabilitation of Waterworks System
      • Candulang
      • Cayupo
      • Catugasan
      • Lomanoy
      • Tiguis
      • La Fortuna
      • Calvario
      • Taug
      • Jambawan
    • National Offices
      • Municipal Circuit Trial Court Branch 12
      • COMELEC
      • DILG
      • Bureau of Internal Revenue
      • Police Department
  • Full Disclosure
    • eSRE Report
  • Livelihood
  • Gallery
  • Contacts
  • News

Category Archives: 2012

Annual Reports 2012

Posted on August 29, 2012 by johannptk — No Comments ↓

CY 2012 Annual Budget Report CY 2012 Annual Procurement Plan CY 2012 Special Education Fund Income and Expenditures Estimates CY 2012 Annual GAD Accomplishment Report CY 2012 Statement of Debt Service CY 2012 Supplemental Procurement Plan

Posted in 2012, Full Disclosure | Leave a reply

1st Quarter 2012

Posted on August 29, 2012 by johannptk — No Comments ↓

20 percent components of IRA utilization 1stqtr

Posted in 2012, Full Disclosure | Leave a reply

2nd Quarter 2012

Posted on August 29, 2012 by johannptk — No Comments ↓

20 percent components of IRA utilization 2ndqtr

Posted in 2012, Full Disclosure | Leave a reply

3rd Quarter 2012

Posted on August 29, 2012 by johannptk — No Comments ↓

Report of SEF Utilization Report of PDAF utilization Statement of Cash Flows GAD Accomplishment report Annual Budget Report 3rd Quarter 2012 Items to Bid CY 2012 3rd qtr Abstract of Bid as Calculated 3rd Qtr 2012 20 percent components of Continue reading →

Posted in 2012, Full Disclosure | Tagged 3rd quarter 2012 | Leave a reply

4th Quarter 2012

Posted on August 29, 2012 by johannptk — No Comments ↓
Posted in 2012, Full Disclosure | Leave a reply

Categories

Latest Updates

  • ITB: PROCUREMENT OF HYDRAULIC OIL AND LUBRICANTS (RE-BID)
  • ITB: PURCHASE OF MATERIALS FOR THE CONSTRUCTION OF TOWER FOUNDATION (FOR A 15m TOWER HEIGHT) LA FORTUNA, LILA, BOHOL (RE-BID)
  • ITB: PURCHASE OF MATERIALS FOR THE CONSTRUCTION OF TOWER FOUNDATION (FOR A 15m TOWER HEIGHT) POBLACION, LILA, BOHOL (RE-BID)
  • ITB: PROCUREMENT OF HYDRAULIC OIL AND LUBRICANTS
  • ITB: PURCHASE OF MATERIALS FOR WATER AND ELECTRICAL INSTALLATION (OLD DUMPSITE) RE-BID
  • ITB: PURCHASE OF DISINFECTANT FOGGING SOLUTION (RE-BID)
  • ITB: PURCHASE OF MATERIALS FOR THE REPAIR AND MAINTENANCE OF LGU VEHICLES & HEAVY EQUIPMENT (RE-BID)
  • ITB: PURCHASE OF MATERIALS FOR THE CONSTRUCTION OF FENCE FOUNDATION (FOR A 15m TOWER HEIGHT) POBLACION, LILA, BOHOL
  • ITB: PURCHASE OF MATERIALS FOR THE CONSTRUCTION OF FENCE FOUNDATION (FOR A 15m TOWER HEIGHT) LA FORTUNA, LILA, BOHOL
  • ITB: PURCHASE OF MATERIALS FOR WATER AND ELECTRICAL INSTALLATION (OLD DUMPSITE)
June 2026
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
2930  
« Jul    
Copyright © 2026 Municipality Of Lila, Bohol . All Rights Reserved.
Powered by WordPress | Theme: Catch Box